Skip to main content
File #: 24R-5623    Version: 1 Name: CRA-Prism Architect
Type: Resolution Status: Passed
File created: 4/30/2024 In control: Community Redevelopment Agency Meeting (CRA)
On agenda: 5/13/2024 Final action:
Title: RESOLUTION NO. CRA-24R-05-12: A RESOLUTION OF THE CITY OF LAUDERHILL COMMUNITY REDEVELOPMENT AGENCY (CRA) AUTHORIZING A CHANGE ORDER TO THE PRISM ARCHITECTURE, LLC. CONTRACT TO AMEND AND UPDATE THE ARCHITECTURAL DESIGN AND CONSTRUCTION DRAWINGS FOR VALUE ENGINEERING REVISIONS AND TO BRING THEM UP TO CODE FOR THE 2 MODEL B HOMES CURRENTLY BEING BUILT AND REPEATER FEES FOR THE FOUR (4) ADDITIONAL LOTS TO BE CONSTRUCTED IN THE TOTAL AMOUNT NOT TO EXCEED $15,240.00; PROVIDING FOR PAYMENT FROM THE APPROPRIATE BUDGET CODE NUMBER(S); PROVIDING FOR AN EFFECTIVE DATE (REQUESTED BY CRA DIRECTOR, SEAN HENDERSON).
Attachments: 1. CRA-24R-05-12-Change Order Prism Architect.pdf, 2. AR CRA-24R-05-12, 3. CRA Prism Cannon Point estimate 04.30.24.pdf
Title

RESOLUTION NO. CRA-24R-05-12: A RESOLUTION OF THE CITY OF LAUDERHILL COMMUNITY REDEVELOPMENT AGENCY (CRA) AUTHORIZING A CHANGE ORDER TO THE PRISM ARCHITECTURE, LLC. CONTRACT TO AMEND AND UPDATE THE ARCHITECTURAL DESIGN AND CONSTRUCTION DRAWINGS FOR VALUE ENGINEERING REVISIONS AND TO BRING THEM UP TO CODE FOR THE 2 MODEL B HOMES CURRENTLY BEING BUILT AND REPEATER FEES FOR THE FOUR (4) ADDITIONAL LOTS TO BE CONSTRUCTED IN THE TOTAL AMOUNT NOT TO EXCEED $15,240.00; PROVIDING FOR PAYMENT FROM THE APPROPRIATE BUDGET CODE NUMBER(S); PROVIDING FOR AN EFFECTIVE DATE (REQUESTED BY CRA DIRECTOR, SEAN HENDERSON).

Body

Request Action:

Approve Change Order in an amount not to exceed $15,240 to Prism Architectural, LLC contract to amend and update the architectural design and construction drawings for value engineering revisions and to bring them up to code for the 2 model B homes currently being built and repeater fees for the four (4) additional lots to be constructed.

Need:

To approve a change order exceed purchase authority level.

Summary Explanation/ Background:

Approve Change Order in an amount not to exceed $15,240 to Prism Architectural, LLC contract to amend and update the architectural design and construction drawings for value engineering revisions and to bring them up to code for the 2 model B homes currently being built and repeater fees for the four (4) additional lots to be constructed for Infill Housing Phase 2B.

Attachments:

Change Order.

Cost Summary/ Fiscal Impact:

$15,240

Estimated Time for Presentation:

Master Plan:

Goal 1: Clean, Green Sustainable Environment

[  ] Increase mass transit ridership  [  ] Reduce City energy consumption

[  ] Reduce water consumption

Goal 2: Safe and Secure City of Lauderhill

[  ] Crime in lower 50% in Broward  [  ] Residents feel safe in neighborhood

[  ] Reduce emergency fatalities

Goal 3: Open Spaces and Active Lifestyle for all ages

[  ] Increase participation in youth spo...

Click here for full text