File #: 24R-5875    Version: 1 Name: FIRE STATION 57
Type: Resolution Status: Passed
File created: 9/10/2024 In control: City Commission Meeting
On agenda: 9/12/2024 Final action: 9/12/2024
Title: RESOLUTION NO. 24R-09-217: A RESOLUTION AWARDING THE BID TO SUPREME BUILDER GROUP (RFP 2024-038) TO PROVIDE FIRE STATION 57 IMPROVEMENTS; AUTHORIZING THE CITY MANAGER TO EXECUTE ANY DOCUMENTS NECESSARY TO GIVE EFFECT TO THIS RESOLUTION; PROVIDING FOR PAYMENT IN AN AMOUNT NOT TO EXCEED $569,189.00 UTILIZING FEMA HAZARD MITIGATION GRANT FUNDING FROM THE APPROPRIATE BUDGET CODE NUMBER; PROVIDING FOR AN EFFECTIVE DATE (REQUESTED BY CITY MANAGER, DESORAE GILES-SMITH).
Attachments: 1. RES-24R-09-217-BID-Supreme Builder Firestation 57-FEMA Grant Funds, 2. AR RES. NO. 24R-09-217, 3. RANKING, 4. SUPEREME COST
Title
RESOLUTION NO. 24R-09-217: A RESOLUTION AWARDING THE BID TO SUPREME BUILDER GROUP (RFP 2024-038) TO PROVIDE FIRE STATION 57 IMPROVEMENTS; AUTHORIZING THE CITY MANAGER TO EXECUTE ANY DOCUMENTS NECESSARY TO GIVE EFFECT TO THIS RESOLUTION; PROVIDING FOR PAYMENT IN AN AMOUNT NOT TO EXCEED $569,189.00 UTILIZING FEMA HAZARD MITIGATION GRANT FUNDING FROM THE APPROPRIATE BUDGET CODE NUMBER; PROVIDING FOR AN EFFECTIVE DATE (REQUESTED BY CITY MANAGER, DESORAE GILES-SMITH).


Body
Request Action:
APPROVE AWARD OF RFP TO FIRE STATION 57 IMPROVEMENTS


Need Summary Explanation/ Background:
AWARD THE RFP TO SUPREME BUILDER GROUP IN RESPONSE TO RFP 2024-038 REGARDING FIRE STATION 57 IMPROVEMENTS. FEMA HAZARD MITIGATION GRANT WAS AWARDED WHICH WILL BE USED FOR PAYMENT. PROPOSAL IS NOT TO EXCEED $569,189.00

Scope of work summarized as follows:

Concrete Flat Roof (3 Story building)

• Take off existing roof down to workable surface and haul away and dispose all debris from roof top.
• Supply and apply asphaltic primer.
• Supply and install tapered 1/4'”polyIso insulation mopped with hot asphalt to
concrete deck.
• Supply and install one ply of GAF strata vent loose laid.
• Supply and install one ply of Ruberoid 20 mopped with hot asphalt.
• Supply and install final layer of mineral cap sheet mopped with hot asphalt.
• Supply and install lead stack to plumbing vent pipes.
• Supply and install 1x6 wood blocking on perimeter edge.
• Supply and install galvanized steel drip edge, terminator bar and stucco stopper.
• Supply and install one ply of GAF strata vent loose laid.
• Supply and install one ply of Ruberoid 20 mopped with hot asphalt.
• Supply and install final layer of mineral cap sheet mopped with hot asphalt.
• Supply and install final layer of Ruberoid cap sheet mopped with hot asphalt in parapets.
• Supply and install lead stack to plumbing vent pipes.
· ...

Click here for full text