File #: 26R-6697    Version: 1 Name: Water Treatment Plant Main Generator Initial Findings Report - Approval of Change Order for Additional Rehabilitation Work - Water Treatment Plant Main
Type: Resolution Status: Passed
File created: 7/8/2026 In control: City Commission Meeting
On agenda: 7/13/2026 Final action:
Title: RESOLUTION NO. 26R-07-120: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF LAUDERHILL, FLORIDA, APPROVING A CHANGE ORDER WITH IPS MIAMI SERVICE CENTER IN THE AMOUNT OF $91,315.08, FOR ADDITIONAL SERVICES TO REPLACE COMPONENTS AT THE WATER TREATMENT PLANT’S MAIN EMERGENCY GENERATOR; PROVIDING FOR PAYMENT FROM THE APPROPRIATE BUDGET CODE NUMBER; PROVIDING THE CITY MANAGER AND CITY ATTORNEY WITH THE AUTHORITY TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; AND PROVIDING FOR AN EFFECTIVE DATE (REQUESTED BY CITY MANAGER, KENNIE HOBBS JR.).
Attachments: 1. RES 26R-07-120 change order IPS Miami, 2. AR 26R-07-120, 3. Q#50032077 - C.O. # 1 - 800KW GEN STATOR ROTOR REWIND, 4. Initial Findings report 50313708

Title

RESOLUTION NO. 26R-07-120: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF LAUDERHILL, FLORIDA, APPROVING A CHANGE ORDER WITH IPS MIAMI SERVICE CENTER IN THE AMOUNT OF $91,315.08, FOR ADDITIONAL SERVICES TO REPLACE COMPONENTS AT THE WATER TREATMENT PLANT’S MAIN EMERGENCY GENERATOR; PROVIDING FOR PAYMENT FROM THE APPROPRIATE BUDGET CODE NUMBER; PROVIDING THE CITY MANAGER AND CITY ATTORNEY WITH THE AUTHORITY TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; AND PROVIDING FOR AN EFFECTIVE DATE (REQUESTED BY CITY MANAGER, KENNIE HOBBS JR.).

 

Body

Request Action:

Briefly state the action requested of the Commission.  What is the expected outcome of the action?

 

 

Recommendation that the Mayor and City Commission approve a Change Order to the existing agreement in the amount of $91,315.08 associated with replacing the Main Rotor and Main Stator to complete the repairs of the Water Treatment Plant Main Generator to authorize the replacement of the generator's Main Rotor and Main Stator, as identified in the contractor's Initial Findings Report, and approve the additional funding required to complete the work.

 

 

Need Summary Explanation/ Background:

Why is there a need for this action and provide summary/background?

 

The City previously awarded a contract for the rehabilitation of the Water Treatment Plant's main emergency generator. As part of the contractor's evaluation process, comprehensive inspections and electrical testing were performed to determine the condition of the generator's internal components. The Initial Findings Report concluded that the Main Rotor and Main Stator have deteriorated beyond acceptable operating tolerances and require replacement. The original rehabilitation plan included an attempt to recondition the existing windings; however, post-reconditioning testing determined that the components could not be restored to acceptable operating values or manufacturer-recommended standards.

 

Because the need for replacement could not be confirmed until the reconditioning process was completed, replacement of the Main Rotor and Main Stator was included in the original bid as optional line items. The contractor has now confirmed that replacement is necessary to restore the generator to reliable operating condition and ensure long-term system reliability.

 

The Water Treatment Plant's main emergency generator is a critical component of the City's water infrastructure and provides emergency backup power necessary to maintain uninterrupted water treatment and distribution operations during electrical outages and emergency events.

 

Approving this Change Order will:

 

Restore the generator to full operational reliability.

Eliminate the risk of future failures associated with the damaged rotor and stator.

Protect the City's investment in the generator rehabilitation project.

Ensure compliance with emergency preparedness and operational reliability requirements for the Water Treatment Plant.

 

Failure to complete the recommended replacement could result in continued generator reliability issues, increased rental/maintenance costs, and the inability to provide dependable emergency power during utility outages.

 

 

Cost Summary/ Fiscal Impact:

Include projected cost, approved budget amount and account number, source of funds, and any future funding requirements

 

The attached quotation provides the additional cost of $91,315.08 associated with replacing the Main Rotor and Main Stator. These costs are above and beyond the work authorized under the existing purchase order and will require approval through this Change Order. Funding is available within the Utilities Department Capital Improvement Program budget

 

 

Attachments:

Number all attachments consecutively.

 

Water Treatment Plant Main Generator Initial Findings Report

Integrated Power Services Quotation

 

 

Budget Code Number(s):40119917506301.

Procurement Information: [check all that apply]

[    ] RFP/Bid                                                               [    ] Emergency Purchase                                           [    ] SBE

[  xx ] Proposal/Quote                     [   ] State Grant Funds                                          [    ] Local Preference

[    ] Piggyback Contract                     [   ] Federal Grant Funds                                         

[    ] Sole Source                                          [   ] Matching Required