RESOLUTION NO. 24R-03-47: A RESOLUTION AWARDING THE BID TO LEGO CONSTRUCTION (RFP 2024-009) TO PROVIDE FIRE STATION 57 IMPROVEMENTS; AUTHORIZING THE CITY MANAGER TO EXECUTE ANY DOCUMENTS NECESSARY TO GIVE INTENT TO THIS RESOLUTION; PROVIDING FOR PAYMENT IN AN AMOUNT NOT TO EXCEED $300,780.00 UTILIZING FEMA HAZARD GRANT FUNDING; PROVIDING FOR AN EFFECTIVE DATE (REQUESTED BY CITY MANAGER, DESORAE GILES-SMITH)
Body
Request Action:
Approve award of bid to Lego Construction in response to RFP 2024-009 re: Fire Station 57 Improvements.
Need:
To award bid for Fire Station 57 improvements
Summary Explanation/ Background:
Award the bid to Lego Construction in response to RFP 2024-009 regarding Fire Station 57 Improvements. FEMA Hazard Mitigation grant was award in the amount of $508,707.45 which will be used for payment.
?Total Awarded amount for FEMA's 75% portion is $494,958.60 and City's 25% match is $54,995.40 which equals a Total of $549,954.00
Any amount OVER $549,954 is the responsibility of the City. All Change Orders above the $549,954 will be paid by City.
Kennie:
The City has also been given $13,748.85 for administrative costs which is in addition to the $549,954.00.
This proposal is in the amount of $300,780.00 for the Work to be completed is as follows:
Concrete Flat Roof
• Take off existing roof down to workable surface and haul away and dispose all.
debris from roof top debris from roof top.
• Supply and apply asphaltic primer.
• Supply and install tapered 1/4'”polyIso insulation mopped with hot asphalt to
concrete deck.
• Supply and install one ply of GAF strata vent loose laid.
• Supply and install one ply of Ruberoid 20 mopped with hot asphalt.
• Supply and install final layer of mineral cap sheet mopped with hot asphalt.
• Supply and install lead stack to plumbing vent pipes.
• Supply and install 1x6 wood blocking on perimeter edge.
• Supply and install galvanized steel drip edge, terminator bar and stucco
stopper.
• Supply and...